Changes for page X0200 - Overview of the CEC Certification Process
Last modified by SuperUwe Trueggelmann on 2025-01-07
Change comment:
There is no comment for this version
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -230,26 +230,6 @@ 230 230 |(% colspan="4" %)((( 231 231 == 4.1 Schedule CEC Assessment == 232 232 ))) 233 -| |The Vendor accepts the date proposed by CEC Administration, or proposes an alternative date.|CEC Administration proposes a date for the CEC Assessment to the Vendor| 234 -|(% colspan="4" %)((( 235 -== 4.2 Conduct CEC Assessment == 236 -))) 237 -|CEC Assessment Conference Call|((( 238 -CEC Assessments are normally conducted as remote audits. 239 - 240 -During a Zoom or Teams call, a CEC Assessor reviews the cecAP and the information provided in the cecAP together with the Vendor. The Vendor provides the relevant evidences. 241 - 242 -As a rough guidance, a CEC Assessment takes 3 to 4 hours for the first product, and an additional 1 to 2 hours per additional product and additional manufacturing site. Depending on the complexity of the CEC Assessment, multiple calls may be needed. 243 - 244 -CEC Administration may offer on a case by case basis, and upon the Vendor's request, conducting CEC Assessments on-site. This will result in additional cost and the price for on-site CEC assessments cannot be automatically determined using the cecAOF. 245 -)))| |cecAP 246 -|Create CEC Assessment Report|If requested by the CEC Assessor, the Vendor defines corrective actions using the CAP worksheet contained in the cecAP and submits these to the CEC Assessor.|((( 247 -The CEC Assessor amends the cecAP to include the CEC Assessor's findings and notes. The CEC Assessor determines compliance levels for each requirements. 248 - 249 -In case of findings, the CEC Assessor, using the CAP worksheet in the cecAP, requests the Vendor to define corrective actions. 250 -)))| 251 -|Submit CEC Assessment Report to CEC Administration| |The CEC Assessor submits the cecAP, in case of findings with corrective actions defined by the Vendor in the CAP worksheet, to CEC Administration.| 252 252 | | | | 253 -| | | | 254 254 255 255