<
From version < 2.1 >
edited by SuperUwe Trueggelmann
on 2024-07-26
To version < 5.1 >
edited by SuperUwe Trueggelmann
on 2024-07-26
>
Change comment: Uploaded new attachment "image-20240726191230-1.png", version {1}

Summary

Details

Page properties
Content
... ... @@ -41,12 +41,20 @@
41 41  |(% colspan="4" %)(((
42 42  == 2.1 Option 1 - Vendor determines the KPIs on their own ==
43 43  )))
44 -|(% colspan="4" %)
45 -|(% colspan="4" %)
44 +|Determine CEC KPIs|(((
45 +The Vendor determines the required CEC KPIs in accordance with the CEC requirements, and on their own.
46 +
47 +The Vendor ensures that amongst others the following conditions are met:
48 +
49 +* Energy Consumption values are determined using the EcoInvent method Cumulative Energy Demand
50 +* CO2 footprint values are determined using the EcoInvent method IPCC 2021
51 +* Material Consumption values are determined taking into account the total direct inputs into the process, and consider reject rates as well as production wastes such as punch grids.
52 +* Full records of measurements and calculations are retained and kept available for the CEC Assessment process.
53 +)))| |
46 46  |(% colspan="4" %)(((
47 47  == 2.2 Option 2 - Vendor procures the CEC LCA Support Service ==
48 48  )))
49 -|(% colspan="4" %)
57 +| | | |
50 50  |(% colspan="4" %)(((
51 51  = 3. Prepare CEC Assessment Plan =
52 52  )))
image-20240726191230-1.png
Author
... ... @@ -1,0 +1,1 @@
1 +xwiki:XWiki.superuwe
Size
... ... @@ -1,0 +1,1 @@
1 +173.7 KB
Content
© 2022 TruCert Assessment Services Inc.
V01-00