129 129  * The amount of oil and natural gas used by the manufacturing site during the previous year
130 130  * The number of products produced in the manufacturing site during the previous year
131 131  * Information about each Layer or main component of the product, at least:
132 -** Supplier
133 -** Type
134 -** Dimensions
135 -** Weight
136 -** Shipping origin and destination, and means of transport
132 +** If the material is not CEC certified:
133 +*** Supplier
134 +*** Type
135 +*** Composition
136 +*** Dimensions
137 +*** Weight
138 +*** Shipping origin and destination, and means of transport
139 +** If the material is CEC certified:
140 +*** Supplier
141 +*** The CEC Claim number of the material, eg "clm1200"
142 +*** Dimensions
143 +*** Weight
144 +*** Shipping origin and destination, and means of transport
137 137  
138 138  The cecLQF allows for more detailed information, and providing more detailed information may result in better KPIs, but for Card Bodies, IC Cards, and Antenna Inlays the CEC Administration is usually able to determine sufficient KPIs from the data above.
139 139  
... ... @@ -262,6 +262,12 @@
262 262  As a rough guidance, a CEC Assessment takes 3 to 4 hours for the first product, and an additional 1 to 2 hours per additional product and additional manufacturing site. Depending on the complexity of the CEC Assessment, multiple calls may be needed.
263 263  
264 264  CEC Administration may offer on a case by case basis, and upon the Vendor's request, conducting CEC Assessments on-site. This will result in additional cost and the price for on-site CEC assessments cannot be automatically determined using the cecAOF.
273 +
274 +{{info}}
275 +See: How to prepare for the CEC Assessment.
276 +{{/info}}
277 +
278 +See: [[Guidance to prepare for the CEC Assessment>>doc:StartPage.C0270 - How to prepare for the CEC Assessment.WebHome]].
265 265  )))| |cecAP
266 266  |Create CEC Assessment Report|If requested by the CEC Assessor, the Vendor defines corrective actions using the CAP worksheet contained in the cecAP and submits these to the CEC Assessor.|(((
267 267  The CEC Assessor amends the cecAP to include the CEC Assessor's findings and notes. The CEC Assessor determines compliance levels for each requirements.
... ... @@ -306,4 +306,3 @@
306 306  If a 12 month interval until re-assessment is permitted, the Vendor must request a re-assessment before the CEC Certificate expires.
307 307  )))|The CEC Administration determines, depending on the level of compliance, the interval until a re-assessment is required. A re-assessment may be required 12 month or 24 month after certification.|
308 308  
309 -