<
From version < 5.1 >
edited by SuperUwe Trueggelmann
on 2024-07-26
To version < 1.2 >
edited by SuperUwe Trueggelmann
on 2024-07-26
>
Change comment: There is no comment for this version

Summary

Details

Page properties
Content
... ... @@ -35,29 +35,7 @@
35 35  CEC Administration distributes signed copies to Vendor contact and TruCert.
36 36  )))|[[CEC NDA Guidance>>doc:StartPage.X1200 - CEC NDA Download.WebHome]]
37 37  |Provide access to CEC Document Package to Vendor| |CEC Administration provides access to the CEC Document Package to the Vendor, either by sending it via e-mail, or by providing access credentials to the Vendor Contact.|
38 -|(% colspan="4" %)(((
39 -= 2. Determine CEC Standard Metrics ("KPIs") for each Product and Manufacturing Site combination =
40 -)))
41 -|(% colspan="4" %)(((
42 -== 2.1 Option 1 - Vendor determines the KPIs on their own ==
43 -)))
44 -|Determine CEC KPIs|(((
45 -The Vendor determines the required CEC KPIs in accordance with the CEC requirements, and on their own.
46 -
47 -The Vendor ensures that amongst others the following conditions are met:
48 -
49 -* Energy Consumption values are determined using the EcoInvent method Cumulative Energy Demand
50 -* CO2 footprint values are determined using the EcoInvent method IPCC 2021
51 -* Material Consumption values are determined taking into account the total direct inputs into the process, and consider reject rates as well as production wastes such as punch grids.
52 -* Full records of measurements and calculations are retained and kept available for the CEC Assessment process.
53 -)))| |
54 -|(% colspan="4" %)(((
55 -== 2.2 Option 2 - Vendor procures the CEC LCA Support Service ==
56 -)))
57 57  | | | |
58 -|(% colspan="4" %)(((
59 -= 3. Prepare CEC Assessment Plan =
60 -)))
61 61  | | | |
62 62  | | | |
63 63  | | | |
image-20240726191230-1.png
Author
... ... @@ -1,1 +1,0 @@
1 -xwiki:XWiki.superuwe
Size
... ... @@ -1,1 +1,0 @@
1 -173.7 KB
Content
© 2022 TruCert Assessment Services Inc.
V01-00