Summary

Details

Page properties
Content
... ... @@ -41,20 +41,12 @@
41 41  |(% colspan="4" %)(((
42 42  == 2.1 Option 1 - Vendor determines the KPIs on their own ==
43 43  )))
44 -|Determine CEC KPIs|(((
45 -The Vendor determines the required CEC KPIs in accordance with the CEC requirements, and on their own.
46 -
47 -The Vendor ensures that amongst others the following conditions are met:
48 -
49 -* Energy Consumption values are determined using the EcoInvent method Cumulative Energy Demand
50 -* CO2 footprint values are determined using the EcoInvent method IPCC 2021
51 -* Material Consumption values are determined taking into account the total direct inputs into the process, and consider reject rates as well as production wastes such as punch grids.
52 -* Full records of measurements and calculations are retained and kept available for the CEC Assessment process.
53 -)))| |
44 +|
45 +|
54 54  |(% colspan="4" %)(((
55 55  == 2.2 Option 2 - Vendor procures the CEC LCA Support Service ==
56 56  )))
57 -| | | |
49 +|
58 58  |(% colspan="4" %)(((
59 59  = 3. Prepare CEC Assessment Plan =
60 60  )))
image-20240726191230-1.png