Changes for page X0200 - Overview of the CEC Certification Process
Last modified by SuperUwe Trueggelmann on 2025-01-07
Change comment:
There is no comment for this version
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -108,13 +108,17 @@ 108 108 Note that, in accordance with the terms and conditions agreed in the cecLOF, the invoiced amount must be paid in full. It is the Vendor's responsibility to ensure that TruCert receives the full invoiced amount in their accounts. All banking fees and conversion losses are the Vendor's responsibility and, if they occur, will result in delays, as the provision of the CEC LCA Support Service will only commence once the full amount has been received. It is highly recommended that the Vendor selects to pay in the invoiced currency and to bear all banking costs when instructing their bank. Checks and similar means of payment are not accepted. Any missing amounts will be reminded by CEC Admin to the Vendor and provision of the CEC LCA Support Service will be delayed until any outstanding amounts, even if small, have been paid. 109 109 ))) 110 110 )))| | 111 -|(% colspan="4" %)2.2.2 Collect Information required to determine the CEC KPIs 111 +|(% colspan="4" %)((( 112 +=== 2.2.2 Collect Information required to determine the CEC KPIs === 113 +))) 112 112 |Send cecLQF| |CEC Administration sends the cecLQF form to the Vendor.|cecLQF 113 -|Enter data in cecLQF|((( 115 +|Enter data in cecLQF and send it to CEC Administration|((( 114 114 The Vendor enters the following minimum information into the cecLQF: 115 115 116 -* The electricity consumption of the manufacturing site 117 -* The number of products produced in the manufacturing site 118 +* Administrative information requested on the Coversheet of the cecLQF 119 +* The electricity consumption of the manufacturing site during the previous year 120 +* The amount of oil and natural gas used by the manufacturing site during the previous year 121 +* The number of products produced in the manufacturing site during the previous year 118 118 * Information about each Layer or main component of the product, at least: 119 119 ** Supplier 120 120 ** Type ... ... @@ -124,6 +124,8 @@ 124 124 125 125 The cecLQF allows for more detailed information, and providing more detailed information may result in better KPIs, but for Card Bodies, IC Cards, and Antenna Inlays the CEC Administration is usually able to determine sufficient KPIs from the data above. 126 126 131 +The cecLQF provides mechanisms to allow considering that parts of the building or the production equipment are not part of the production of the products subject to CEC Certification, though these require the Vendor to provide additional information. 132 + 127 127 For more complicated products such as: 128 128 129 129 * IC - Integrated Circuits ... ... @@ -132,13 +132,25 @@ 132 132 * Card materials 133 133 134 134 please contact the CEC Administration before starting to enter data into the cecLQF. 141 + 142 +The Vendor retains records of measurements and calculations and keeps them available for the CEC Assessment process. 143 + 144 +The Vendor sends the completed cecLQF to contact@cecocert.com 135 135 )))| |((( 136 136 cecLQF 137 137 138 138 CEC LQF Guidance 139 139 ))) 140 -| | | | 150 +|Review and revise cecLQF|The Vendor provides Corrected or requested additional information by updating the cecLQF as requested by CEC Administration.|CEC Administration reviews the cecLQF, and if necessary, informs the Vendor of necessary corrections and if additional information is needed.| 141 141 |(% colspan="4" %)((( 152 +=== 2.2.3 Determine CEC Metrics from cecLQF === 153 +))) 154 +| | |((( 155 +CEC Administration calculates the CEC Metrics from the information provided in the cecLQF and provides them to the Vendor in additional worksheets in the cecLQF file. 156 + 157 +The resulting version of the cecLQF file contains a worksheet that provides the CEC Metrics ready to be copied and pasted into the cecAP form's Claim Details worksheet. 158 +)))| 159 +|(% colspan="4" %)((( 142 142 = 3. Prepare CEC Assessment Plan = 143 143 ))) 144 144 | | | |